EZ Handrail EZG106 Manual de instrucciones Pagina 1

Busca en linea o descarga Manual de instrucciones para No EZ Handrail EZG106. EZ Handrail EZG106 Instructions / Assembly [en] Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 23
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
E
E
E
Z
Z
Z
H
H
H
A
A
A
N
N
N
D
D
D
R
R
R
A
A
A
I
I
I
L
L
L
®
®
®
G
G
G
L
L
L
A
A
A
S
S
S
S
S
S
&
&
&
A
A
A
L
L
L
U
U
U
M
M
M
I
I
I
N
N
N
U
U
U
M
M
M
R
R
R
A
A
A
I
I
I
L
L
L
I
I
I
N
N
N
G
G
G
S
S
S
Y
Y
Y
S
S
S
T
T
T
E
E
E
M
M
M
S
S
S
CODE COMPLIANT RAILING FOR YOUR LIFESTYLE
CONTENTS
Introduction ......................................................................................................................................................................................2
Tools You Will Need (not included) .....................................................................................................................................................3
EZ Glass Railing Box Contents .............................................................................................................................................................4
EZ Glass Railing Components ..............................................................................................................................................................5
EZ Glass Railing Assembly Overview ...................................................................................................................................................6
EZ Post Installation with Separate Mounting Flange ............................................................................................................................7
EZ Post Installation with Welded Base Plate .......................................................................................................................................8
Constructing the Bottom Glass Channel Assembly............................................................................................................................. 10
Installing the Lower Assembly .......................................................................................................................................................... 11
Constructing the Upper Glass Channel Assembly ............................................................................................................................... 12
Installing the Upper Assembly .......................................................................................................................................................... 13
Glass Baluster Layout ....................................................................................................................................................................... 14
Placing Setting Blocks in Bottom Glass Channel ................................................................................................................................. 15
Installing the Glass Balusters ............................................................................................................................................................ 16
Installing the Glass Spline ................................................................................................................................................................. 17
Installing the Glass Spacers .............................................................................................................................................................. 18
Stair Applications and Non 90-degree Angles .................................................................................................................................... 19
Stair Railing Helpful Hints & Apps ..................................................................................................................................................... 20
EZ Gate Instructions ......................................................................................................................................................................... 21
Care and Maintenance ..................................................................................................................................................................... 22
10-year Limited Warranty ................................................................................................................................................................ 22
Engineered Drawings ....................................................................................................................................................................... 23
Vista de pagina 0
1 2 3 4 5 6 ... 22 23

Indice de contenidos

Pagina 1 - CONTENTS

EEEZZZ HHHAAANNNDDDRRRAAAIIILLL®®® GGGLLLAAASSSSSS &&& AAALLLUUUMMMIIINNNUUUMMM RRRAAAIIILLLIIINNNGGG SSSYYYSSSTTTEEEMMMSSS

Pagina 2 - Introduction

Constructing the Bottom Glass Channel Assembly STEP 1: 1. Measure the distance between your existing posts or newly installed EZ Posts. A more accur

Pagina 3

Installing the Lower Assembly STEP 1: 1. Attach Mid Support (K) underneath the Bottom Assembly t the midpoint of the railing section (Illustratio

Pagina 4 - 8 Ft. EZ Glass Railing Kit

Constructing the Upper Glass Channel Assembly STEP 1: 1. Measure the distance between your existing posts or newly installed EZ Posts. A more accur

Pagina 5 - EZ Glass Railing Components

Installing the Upper Assembly STEP 1: 1. The inside dimension of the upper Top Glass Channel Assembly and the lower Bottom Glass Channel Assembly

Pagina 6 - Illustration #1

Glass Baluster Layout (DO NOT INSTALL GLASS AT THIS POINT) After you have installed the Top Glass Assembly and Bottom Glass Assembly, you are ready

Pagina 7

Placing Setting Blocks in Bottom Glass Channel STEP 1: 1. Place two Setting Blocks (F) in the Bottom Glass Channel Assembly for each Glass Balu

Pagina 8

Installing the Glass Balusters STEP 1: 1. Ensure the Setting Blocks (F) are 1/2 inch in on each side of the Glass Balusters. (Illustration #11).

Pagina 9

Installing the Glass Spline STEP 1: 1. After checking for the proper glass embedment of 1/2" in., apply the Glass Spline (G) around your first

Pagina 10

Installing the Glass Spacers STEP 1: After installing the midpoint Glass Baluster (H) with four pieces of Glass Spline (G), it is now time to install

Pagina 11 - Midfoot (K)

Stair Applications and Non 90-degree Angles This kit is manufactured for level runs only. For stair installations, custom Glass Balusters must be or

Pagina 12 - Critical Measurement

Congratulations! Congratulations! You are on your way to a maintenance free railing system that is easily assembled and installed. With your EZ Handr

Pagina 13 - 34” Commercial

Stair Railing Helpful Hints & Apps RUN (TREAD LENGTH) RISE 10" 10.5" 11" 11.5" 12" 12.5" 13" 13.5"

Pagina 14 - Glass Baluster Layout

EZ Gate Instructions EZ Gates can swing left or right depending on the hinge location. Standard hinges and gravity latch are included with all EZ Ga

Pagina 15 - Note: Glass installed

Care and Maintenance While most powder coat finishes are tougher and much more flexible than conventional solvent based paints, they are about the same

Pagina 16 - ½” from edge

severity of any of these conditions depends upon the geographical location of your home, the cleanliness of the air in your area and many other local

Pagina 17 - Installing the Glass Spline

Tools You Will Need (not included) Level Tape Measure Chop Saw (60 tooth wood blade) Pencil Screw or Impact Gun ¼” He

Pagina 18 - Installing the Glass Spacers

EZ Glass Railing Box Contents 6 Ft. EZ Glass Railing Kit Qty Length Description 1 6’ Top Cap (A) 1 6’ Bottom Channel (C) 2 6’ Glass Channel (B1

Pagina 19

EZ Glass Railing Components Top Cap (A) Glass Spline (G) Bottom Channel (C) (Preassembled w/ B1 below) Setting Block (F) Glass Cha

Pagina 20

EZ Glass Railing Assembly Overview Glass Spline ( G ) Top Cap Assembly ( A )( B1 ) Bottom Channel Assembly

Pagina 21 - EZ Gate Instructions

EZ Post Installation with Separate Mounting Flange Ensure that you have a solid mounting surface for your EZ Post base fasteners. Existing posts or

Pagina 22 - 10-year Limited Warranty

EZ Post Installation with Welded Base Plate Start by ensuring that you have a solid and level mounting surface for your Post(s). Washers or galvanize

Pagina 23 - Engineered Drawings

Installation into concrete STEP 1: 1. Turn the post upside down on a hard surface and prepare to drill larger holes in base plate. Enlarge the (4)

Comentarios a estos manuales

Sin comentarios