Placing Setting Blocks in Bottom Glass Channel
STEP 1:
1. Place two Setting Blocks (F) in the Bottom Glass Channel Assembly for each
Glass Baluster (H). Make sure the water relief channel is facing down. Use
silicone caulk (sold separately on top of setting blocks to secure glass in place.
Do not install glass at this time. The Top Assembly does not require setting
blocks.
Note: Use silicone caulk to hold Setting Blocks (F) in place for stair or ramp
installations. (Silicone caulk sold separately).
Setting Block (F)
2 pcs per
baluster
(F)
(F)
Water relief channel
Illustration #8
(F)
Note: Glass installed
at next step
www.ezhandrail.com for videos 15